On December 7, 2013, SAFTRONICS(PTY)LTD. (Johann) and Steven (otuta) worked with our personnel to test the 12000KVA project.
The test of 12000KVA transformer is divided into appearance inspection, fan and temperature control inspection, voltage ratio and phase Angle test, winding dc resistance measurement, winding and core insulation resistance test, power frequency withstand voltage test, induction withstand voltage test, no-load loss and no-load current measurement, load loss and impedance voltage measurement and partial discharge measurement.
After the test ended, Johann and Steven expressed that they were very satisfied with the test results of the 12000KVA transformer. The customer's satisfaction is the reward for the efforts of all the staff of our company.
Front view of 12000kva dry type rectifier phase-shift transformer
Johann and Steven are discussing the test equipment with our staff